This applies to assets such as lighting, roading, water, wastewater and surface water systems.
The selection of materials for installation in a particular location should consider the particular design constraints of the project in conjunction with the criteria set out in the Christchurch City Council Infrastructure Design Standards.
Final acceptance is granted to those components of an asset system that fully comply with the requirements.