There are rules for carrying out all pipeline CCTV inspections, as required by Construction Standard Specifications (CSS).

All pipeline CCTV inspections required by CSS are to be carried out in accordance with:

  • the most recent version of the Christchurch City Council Pipeline CCTV Specification; and
  • the New Zealand Pipe Inspection Manual 3rd Edition (NZPIM). 

The order of precedence shall be:

  1. Christchurch City Council Pipeline CCTV Specification [PDF, 892 KB]
  2. NZPIM General Specification
  3. Other provisions in NZPIM.

Useful information

Template downloads

Download the templates referred to in the above documents:

Templates examples

As-built and CCTV Data Portal