What |
We are replacing the existing wastewater main and laterals as it has come to the end of its life. This needs to be replaced before the new water main is installed later this year. |
---|---|
Why |
The existing water main pipe has reached the end of its life and now needs to be replaced. |
Where |
Palatine Terrace to Domett Street (refer to map below) |
When |
From May 2022 to April 2023. Monday to Saturday, 7.00am to 6.00pm (weather/site condition dependent). |
Contact |
Head Contractor, Seipp Construction. Phone Stuart Anderson on 03 423 1718, Monday to Friday, 8:00am to 5:00pm. |
The existing water main pipe on Eastern Terrace, adjacent to the Heathcote River, needs to be replaced as it’s reached the end of its life. This pipe is critical for maintaining the supply of fresh drinking water for this part of the city.
Phase 1 and 2 of the project have been underway since November 2021 and are nearing completion. These two phases included investigation works and relocating existing pipes, cables and other obstacles that needed to be removed to complete the works. There is some remaining work as part of phase 2 currently underway on Eastern Terrace (marked on the map in red), and on Norwood Street between Tennyson Street and Fisher Avenue.
Noise
There may be increased noise, dust and vibrations during work but it shouldn’t impact on your power, water, gas or phone services.
Safety
Safety is our biggest priority so please keep children and pets away from worksites.
Bins
Please put your bins out as usual before 6am on your collection day. Our crew will move and return them if needed.