Johns Drain - renewal (Stormwater)

What

We are renewing and upgrading the existing stormwater drain, which is an open, timber-lined drain.

Why

This renewal is required to replace deteriorated infrastructure. Some of the old timbers are slumping, and the surrounding banks also need extra supports to keep them stable.

Where

Johns Drain, Christchurch (as depicted below).

When

Construction is scheduled to start early October 2025 with an expected duration of approximately 15 weeks.
Monday to Friday, 7am to 6pm, Saturday 8am to 12pm (weather/site condition dependent).

Contact

The contractor is City Care Ltd Mikaela Abraas. Phone 022 0173972, Monday to Friday, 7am to 6pm, Saturday 8am to 12pm, or email mikaela.abraas@citycareproperty.co.nz.

Details

We will be renewing the timber lining along sections of John’s Drain to stabilise the existing banks and address areas that are failing and slumping.

  • Temporary traffic management measures may be in place where works interface with road corridors or private access. Please follow all posted signage.
  • We are committed to minimising disruption and will remove traffic management measures as soon as it is safe to do so.
  •           Pedestrian access will be maintained where possible, with detours in place as required. Please follow instructions from our temporary traffic management teams.
  • Construction activities may cause temporary increases in dust, noise, and vibration. We apologise for any inconvenience and thank you for your patience while we complete these important works.