Evans Pass Road - test pit works

What

We will be carrying out minor excavation works to check underground conditions (test pits), followed by the installation of a small drainage line (cut-off drain).

Why

This work is part of planned infrastructure improvements to help manage stormwater in the area.

Where

Evans Pass Road, near the Summit Road intersection.

When

The work is expected to start Thursday 21 August for the Test pits. Thursday 26 August to 29 August 2025 will cover the cut off drain installation. Hours of work will be between 8am - 5pm, Monday to Friday.

Contact

The contractor is Higgins. Phone Lam Cai, Senior Project Manager on 027 287 7288, Monday to Friday, 8am to 5pm.

Details

 

Traffic Impacts

  • There will be temporary changes to traffic flows with short delays possible.
  • There will be cones and construction vehicles while work is carried out. On-street parking will be unavailable.
  • Temporary traffic signals will be in place to manage traffic through the work site. Please follow the directions of traffic controllers and signage.

Key Information

  • Residue from new surfaces, like asphalt and chipseal, can stick to your shoes or car tyres after the first few days of works being completed. Please be mindful of this when entering your garage or home. Please also be assured that we have been working with contractors to source new products that limit the chances of this occurring, and have already been trialling them across the wider Christchurch area.
  • There may be periods of noise and vibration, although we will aim to keep this to a minimum.
  • Work will be rescheduled if the weather is bad.
  • We know roadworks can be  disruptive and were grateful for your co-operation and understanding.
  • Surfaces may be uneven at times, but we will aim to minimise this.

 