Jollie Street, Nalder Place and Rasen Place - watermain renewal

What

We are replacing watermain and sub-main pipes, which are part of the annual renewals project.

Why

Existing watermain and sub-main pipes are reaching the end of their service life and require replacing.

Where

Jollie Street, Nalder Place and Rasen Place, Linwood.

When

14 July 2025 to end of October 2025. Monday to Friday, 7am to 6pm (weather/site condition dependent).

Contact

The contractor is Isaac Construction. Phone 027 323 0056, Monday to Friday, 7am to 6pm.
Please advise us if you have any specific property access requirements, e.g. medical visits, home help, large vehicle deliveries or planned works.

Details

There may be times when vehicle access to properties is temporarily restricted.  The contractor will door knock beforehand to allow residents to move vehicles if necessary.

On-street parking during the works will be restricted, however full pedestrian access will be maintained.

The works may result in increased dust, noise and vibrations.  We will try to keep any disruption to a minimum, and we apologise in advance for any inconvenience.

Water supply to your property will be maintained, with a separate notice being given for the shut-off when connecting to the new pipes.

Jollie Street will become one-way, with entry only from Butterfield Avenue.

Nalder Place and Rasen Place will be closed with resident access only.

We will endeavour to complete works as efficiently as possible and return the road to normal operating conditions.

Thank you for your understanding and cooperation during the works.

Takiuru ki ā mātou ratonga
Log in to our services