Tilford Street - pump station renewal

What

Replacement of a wastewater pump station on Tilford Street.

Why

A new wastewater pump station will be installed to replace the existing pump station as it is close to the end of its serviceable life.

Where

36P Tilford Street, Woolston.

When

12 May 2025 to 30 November 2025. Monday to Friday (with occasional Saturdays as required), 7am to 6pm (weather/site condition dependent).

Contact

The contractor is Hunter Civil Ltd. Phone 022 139 4003, Monday to Friday, 7.30am to 5.30pm.

Details

  •  Christchurch City Council has contracted Hunter Civil to undertake construction of a wastewater pump station at 36P Tilford Street.
  • During the works, there will be increased noise and vibration from the use of machinery for activities such as soil excavation, dewatering and infrastructure installation.
  • On-street parking will be affected around the work site, cones will indicate where parking will not be available.
  • Property access will be maintained.  Please let us know if you have any specific property access needs e.g. medical visits, home help, large vehicle deliveries or planned works.
  • Pedestrian access will be maintained past the site.  Please follow the signage and directions of temporary traffic management.
  • Please put your rubbish bins out as usual by 6am on your collection day.  Our team will move them and return them if needed.
  • Thank you for your patience as we upgrade the wastewater pump station in your area.