Quarry View Drainage Reserve Upgrade

What

Work includes hard and soft landscaping, construction of grit paths, asphalt path and timber boardwalk structures.

Why

To improve connectivity between Muirhill and Spalling Road, enhance access for maintenance crews and undertake additional planting in the basin and along the banks of the drain.

Where

Quarry View Drainage Reserve, Muirhill Street, Halswell.

When

1 April 2025 to mid-July 2025. Monday to Friday, 7am to 6pm (weather/site condition dependent).

Contact

The contractor is Grounds and Services Limited. Phone Dean Ewen, 027 403 0499, Monday to Friday, 8am to 4pm.

Details

  • There will be cones and construction vehicles whilst work is being carried out.
  • Safety fencing will be in place for the duration of the works.
  • Pedestrian and cycle access from Muirhill Street to Spalling Road will not be possible during the works.
  • Work will be rescheduled if the weather is bad.
  • There may be periods of noise and vibration, although we aim to keep this to a minimum.
  • Please do not enter the site during construction.

Takiuru ki ā mātou ratonga