Kerrs Water Supply Pump Station Upgrade - wells drilling

What

Drilling new deep wells and to ensure long-term drinking water security for the community.

Why

The existing wells and station have reached the end of their useful asset life and do not meet future water demand. New wells need to be drilled and secured prior to rebuilding the station to meet the latest water quality standards.

Where

Kerrs Water Supply Pump Station, 46 Kerrs Road, Avonside.

When

Mid August 2024 to late August 2025, Monday to Saturday, 7am to 6pm. (weather/site condition dependent).

Contact

The Contractor is McMillans Drilling. Phone Iain Haycock on 021 730 574, Monday to Friday, 7am to 6pm.

Details

We need to mobilise some large machinery to the site so we’ll be removing trees within the pump station site.

 

What does this mean for you?

  • There may be brief disruptions to traffic initially while large equipment is loaded onto the site.
  • You’ll be able to access your property at all times.
  • No work will be done on Sundays or public holidays.
  • Drinking water will not be affected at all.

Onsite hazards

  • Construction equipment and workers onsite.
  • Construction equipment moving into and out of the work site.
  • These works will take place from mid August 2024 until the end of August 2025.
  • Drilling operation will create some noise. We aim to minimise noise as much as possible.
  • Physical works onsite at 46 Kerrs Road.

Thank you for your patience while we upgrade the pump station.

 

 