(NIGHT WORKS) Sawyers Arms Road - railway crossing

What

Potholing to locate underground services.

Why

This work will inform the design of planned railway crossing upgrades to support the Northern Line cycleway. Signalised pedestrian crossings will make it safer and easier for pedestrians and cyclists to cross this busy road.

Where

Railway crossing on Sawyers Arms Road.

When

29 July 2024 to 31 July 2024. Monday to Wednesday, 6pm to 6am (weather/site condition dependent).

Contact

The contractor is Fulton Hogan. Phone 0800 7623 34 (0800 ROAD FH), Monday to Friday, 8am to 5pm or email cant.info@fultonhogan.com. After business hours, please feel free to call us if the matter is urgent.

Details

What are we doing?

From 6pm on Monday 29 July, we’ll be potholing around the railway crossing on Harewood Road. This investigation work is required to understand the location and condition of underground services, as well as any potential clashes or risks to the construction of the upgraded railway crossing. If weather is unfavourable, this work will be carried out on a night following.

Traffic Impacts

  • During our work hours, traffic will be reduced to one lane through the work area shown on the map. Temporary traffic lights will be used to manage traffic through the work area. Please expect delays.
  • Pedestrian and cyclist access across the railway crossing will be available, under escorted crossing by our workers. Outside of our work times, safe pedestrian access will be made available.
  • We will need to restrict some on-street parking, so we will place no parking cones out before we start work. We will aim to minimise this as much as possible.
  • Please be on the lookout for changes in traffic management and follow the signs.

Night Works

Work will be carried out at night. The crew need lights to see what they are working on so you may notice extra light coming from the street. There will be noise from trucks, machinery and the crew working overnight.

Due to the high traffic volumes in this area and the narrow road width, work must be completed on night shift. This ensures the safety of our workers and also reduces traffic impacts.

We will aim to complete the most disruptive work in the evenings to keep any overnight disruption to a minimum. We will also aim to complete the work as quickly as we can.

How do we carry out potholing?

During potholing, a hydrovac will be on site. This machine uses high-pressure water and a powerful vacuum to remove soil, which is noisy work.

The soil is then transferred to a debris tank to keep mess to a minimum. This is a safe, non-destructive and accurate way to remove soil or locate underground utilities, such as pipes, electrical cables and phone lines.

Once the services have been located and assessed, the potholes will be backfilled and resurfaced.

Other work in the area

Separate notice will be issued for these nearby works:

  • From 6pm to 6am on 24, 25 and 28 July 2024, one-lane/traffic light controlled traffic management will be in place at the Langdons Road railway crossing to support investigations for the Northern Line cycleway railway crossing upgrades.
  • Isaac Construction (contractor): From 6pm to 6am on Thursday 25 July and 7am to 6pm on Friday 26 July, traffic management will be in place on Matsons Avenue, including at the intersection of Harewood Road.
    This investigation work will inform the approach for other projects in the area.  Please call Isaac Construction on 03 359 9145 for more information.