Major Cycle Route (MCR) Northern Line Cycleway construction

What

We are upgrading the railway level crossing, including the footpath, at Barnes Road. This is part of the construction of the Northern Line Cycleway, which we are extending along the railway corridor through this area.

Why

To ensure safer approaches across the railway for pedestrians travelling along Barnes Road. The upgrade will also include the development of safe and easy access onto the new section of the Northern Line Cycleway, where it intersects with the crossing.

Where

Barnes Road railway crossing, Redwood.

When

Sunday, 12 November 2023 to Friday, 17 November 2023, 7am to 5pm (weather/site condition dependent).

Contact

The contractor is Downer NZ. Phone Jason Gale on 03 397 0700, Monday to Friday, 8am to 5pm.

Details

What are we doing?

  • We are constructing a shared path cycleway through the rail corridor between Tuckers Road and Sturrocks Road and between Barnes Road and Main North Road. (The section between these points, through Barnes Reserve, is already complete.)
  • As part of the works to extend the cycleway, the railway level crossing at Barnes Road needs to be upgraded. This will include track formation, track works and footpath replacement.  Note: There is only a footpath on one side of Barnes Road – the southern side of the railway level crossing.

Traffic Impacts

  • Road closure - During the road closure on either side of the Barnes Road railway crossing, a detour route will be in place, with signage to redirect traffic around the closure.  

 

 

 

 

 

Takiuru ki ā mātou ratonga
Log in to our services