Replacement of Randolph Street wastewater mains & laterals. |
---|---|
Why |
The wastewater pipes under Randolph Street were constructed in the 1920's and have reached the end of their economic design life. |
Where |
Between 92 Randolph Street and 114 Randolph Street, Woolston. |
When |
25 January 2023 to April 2023. Monday to Saturday, 7am to 6pm (weather/site condition dependent). |
Contact |
The contractor is March Construction Ltd. Phone Joshua Morgan on 027 250 0307, Monday to Friday,7am to 5pm. |