Wainui Street to Kawaka Street - stormwater renewal

What

Replace the existing 150mm diameter pipe with a 300mm diameter PVC pipe on the same alignment.

Why

Replace undersized pipes and reduce the flooding issues in the area.

Where

35 Wainui Street and 17 Kawaka Street to Kawaka Street cul-de-sac, Riccarton.

When

13 May 2024 to mid-July 2024. Monday to Friday, 7am to 6pm, (weather/site condition dependent).

Contact

The contractor is March Construction Ltd. Phone 03 323 8085, Monday to Friday, 8am to 5pm.

Details

We are carrying out some drainage work in your area:

  • The jobsite will be located in 35 Wainui Street and 17 Kawaka Street to Kawaka Street cul-de-sac.
  • There will be traffic management in place during the works so please follow all signage as directed.
  • The work may result in increased dust, noise and vibrations.  We will try to keep any disruption to a minimum and apologize in advance for any inconvenience. 
  • The work will also involve the removal and replacement of trees and fences along and beside the pipeline's alignment.
  • Safety is our number one priority.  Safety is your responsibility too.  Stay clear and stay alert.  For security, temporary fencing will be installed as the work proceeds.  Please keep children and pets at a safe distance from the worksite and construction machinery.

 

Takiuru ki ā mātou ratonga
Log in to our services