Main / Beachville Roads - guard rail replacement

Update

What

Guard rail replacement.

Why

These works are part of the Minor Safety Transport Contract to improve the road condition and safety in this area.

Where

Main Road and Beachville Road. Detours will be in place at Beachville Road and Celia Street.

When

Work will start on 24 May 2021 and is expected to be completed by late May 2021 (weather dependent). Work will be undertaken between Monday to Friday, 9am to 3pm.

Contact

The contractor is Higgins Contractors Ltd. Phone Mondri du Preez on 021 349 692 between Monday to Friday, 9am to 3pm. Please advise us if you have specific property access requirements e.g. medical visits, home help, large vehicle deliveries, planned works.

Impacts to traffic

  • Detours are needed to undertake the works safely.
  • Traffic Management will be on site as Stop/Go will be operating and the road shoulder will be closed.
  • On street parking will be unavailable within the construction area. Vehicles remaining within the construction work area may be towed to another nearby street.

Impacts to residents

  • Access to residents' driveways will be maintained where practical. Any work planned across a resident's driveway will be brief and access will be re-instated as soon as possible.
  • Pedestrian access will be maintained but may change on a day to day basis depending on works.
  • If walking through the construction site, please ensure your footwear is clear of any debris before entering your property to avoid damage to flooring, etc.
  • There will be periods of construction noise and vibration which the contractor will do their best to minimise.
  • Pet owners are advised to keep animals inside their properties and away from the construction area for their safety.