Brougham/Barrie Streets - stormwater pipe replacement

What

We’re replacing brick barrel stormwater pipes at the intersection of Brougham and Barrie Streets.

Why

The existing pipes have reached the end of their useful life and require replacement.

Where

Brougham Street near Barrie Street, Addington.

When

Work will start on Tuesday 6 April 2021 and is expected to be completed by late June 2021 (weather dependent). Work will be undertaken between Monday to Friday, 7am to 6pm, with some weekend works when required. ***NIGHT WORK: a week of night work will be required to install the pipe and the start of this work will be advised closer to the time.

Contact

The contractor is Downer NZ. Phone Chris Miles on 0800 026 420 between Monday to Friday, 7am to 5pm. Please advise Chris if you have specific property access requirements.

Details

A 52 metre section of existing brick barrel stormwater pipe, built in 1910, has reached the end of its useful life and needs replacing with a new main.

  • NIGHT WORK: a week of night work will be required to install the pipe. As this work can be noisy, it will be carried out at the start of the shift so any potential disruption will occur as early as possible in the night. We need one-lane traffic on Brougham Street to install the pipe underground and we are not permitted to do this during daylight hours due to the heavy traffic volumes.
  • Speed reduction: two lanes in each direction on Brougham Street will be maintained during day time
  • Road closure: Barrie Street and James K Baxter Place may be closed for the duration of the works with detour routes in place. Please follow temporary signage installed around the intersection
  • Vehicle access: there may be times when vehicle access to properties will be temporarily restricted. The contractor will contact residents beforehand to allow residents to move vehicles if necessary
  • The work may result in increased dust, noise and vibrations. We will try to keep any disruption to a minimum

Stay updated

We’ll publish newsletters at times throughout the construction period. Please visit our webpage at ccc.govt.nz/brougham(external link) to subscribe to the newsletter. Alternatively, email broughamSW@ccc.govt.nz to ask to be added to the mailing list.

If you have any questions or would like further information on the project, please call us on 03 941 8999 or email broughamSW@ccc.govt.nz