London Street at Old Museum – Footpath Repairs

What

Undertaking minor adjustments to the existing footpath outside the old museum site by removing the existing asphaltic footpath and replacing with cobble stones to match into surrounding pavement materials.

Why

To complete earthquake repairs and enhance the street, by installing Coble stones.

Where

Footpath adjacent to 69 London Street, Lyttelton, Christchurch

When

Work will start on Monday 23rd November and is expected to be completed within 1 week (weather dependent). The work will be carried on day shifts out between 7am – 7pm (Monday – Friday).

Contact

The contractor is Higgins Contractors Ltd. Phone 03 348 8010 between Monday and Friday, 7am to 7pm. Please advise us if you have specific property access requirements e.g. medical visits, home help, large vehicle deliveries and planned works.

Please follow the directions provided by the onsite traffic management team.

Street side parking may be temporarily unavailable throughout the duration of the works to allow for safe conveyance of pedestrians around the work site.

There may be temporary footpath closures / cordoned off areas.

There will be noise disturbance during the works but this will be kept to a minimum.

Takiuru ki ā mātou ratonga
Log in to our services