What |
We’re installing a new watermain along Hazeldean Road. As part of this work, Grove Road will be closed between Harman Street and Hazeldean Road. Hazeldean Road will also be one-way eastbound between Lincoln Road and Grove Road. |
---|---|
Why |
The ageing watermain is being replaced to create a more reliable network. We are doing this work at the same time we’re installing new priority bus lanes and completing other safety improvement work in the area, to minimise future disruption. |
Where |
Grove Road (between Harman Street and Hazeldean Road) and Hazeldean Road (between Grove Road and Lincoln Road), Addington |
When |
25 May to early July 2022. Monday to Saturday, 7am to 6pm (weather/site conditions dependent). |
Contact |
The contractor is Isaac Construction. Phone Peter Chum on 0272366279 or 03 359 9145 or email Lincolnroad2022@isaac.co.nz , Monday to Friday, 7am to 7pm. |
This is stage 1.4 of works and is part of a watermain upgrade along the length of Lincoln Road from the Barrington Street/Whiteleigh Avenue intersection, through to Moorhouse Avenue.
All work has been planned in stages to reduce the impact on local businesses and residents, and to keep traffic flowing as best as possible.
Grove Road will be closed from 1June to 17 June 2022. Hazeldean Road will be one-way eastbound from 1June to 1 July 2022. These closures will be in place 24 hours a day for the duration of the works.
Impacts on traffic
Impacts of work
Stay updated
If you would like to receive updates about the Lincoln Road bus lanes project, sign up to receive eNewsletters or find out more online at ccc.govt.nz/lincolnroad
You can also visit isaac.co.nz ‘ongoing projects’ for more specific details about day-to-day operations, to get in touch with the contractor or to report any issues.