Annex / Lincoln Road - water level monitoring installation

What

We are installing a new water level monitoring site.

Why

The new water level monitoring site will measure water levels in the Heathcote River which will be used for control of water outlets from stormwater storage basins in the Upper Heathcote catchment.

Where

Corner of Lincoln Road and Annex Road.

When

November 2021 to late- April 2022.

Contact

The contractor is Downer New Zealand. Phone Heath Etches on 021 941 677.

Details

  • Work will be undertaken Monday to Friday from 7:30am to 6:00pm (weather/site condition dependent). If work is required on a Saturday to ensure we meet the completion date, it will be between 7:30am to 4pm.
  • There will be some temporarily footpath / cycleway closures during construction deliveries to the site.
  • There will be an increase in vehicle movements into the site, such as delivery vehicles and construction equipment.
  • There will be some noise during electrical cabinet foundation work and cable trenching.
  • Signage about the work will be placed on temporary fencing around the work site.