South Hagley Park - Hospital Corner Pathway renewal

What

We are renewing the section of the pathway from Hospital Corner to Hagley Oval.

Why

We are renewing this section of pathway due to its damaged and overall poor condition for improved pedestrian access and drainage through this area of Hagley Park

Where

South Hagley Park, Christchurch

When

October 2021 to November 2021 (weather/site condition dependent).

Contact

The contractor is Partridge Contracting Ltd. Phone 03 329 6320, Monday to Friday, 8.00am to 5.00pm.

Details

  • This existing footpath from Hospital Corner to Hagley Oval will be closed to the public during the construction activities.
  • The public will be directed to use an alternative route to bypass the site or use other existing paths within the park throughout duration of this project.
  • Temporary site fencing and signs will be in place to help direct pedestrians around the site.      
  • There will be heavy machinery operating at this time with construction plant and vehicle movements taking place during the day
  • There may be increased noise and dust during these works.
  • Construction vehicles will be accessing the site from multiple locations during the construction period. Mainly using the existing vehicles entrances near Hagley Oval.
  • There will be safe pedestrian crossing points located at intersecting path connections related to the work site.