Settlers Hill - wastewater renewals

What

Renewal of wastewater mains and laterals.

Why

The pipes are being replced to reduce infiltration into the wastewater network.

Where

There will be three work sites in the road adjacent to 6, from 18 to 20 and from 12 to 25

When

18 October to 3 November, 7am to 6pm (weather/site condition dependent).

Contact

The contractor is Hunter Civil. Phone Andreu Catalana 027 247 5145 or Peter Anovo 022 139 4003.

Details

  • There will be a series of road closures for the works and they will be in the following order : 12 to 25 settlers Hill will be closed for 3  days from 18 October, partial closure adjacent to the works; from 6 to 25 Settlers Hill, 7 days full closure from the culvert at the bottom of the hill.
  • For the full road closure residents that need to use their vehicles are advised to park them at the bottom of Settlers Hill, foot access will be maintained past the works area at all times
  • Traffic management and safety fencing will be in place for the duration of all the works, please obey all traffic management signage and contractors instructions
  • Access through the work sites will be available for emergency services if required.
  • Individual property vehicle access may be restricted as the works proceed, the contractor will liaise with residents affected to minimise disruption
  • The refuse collection will proceed as usual, those properties behind the road closure should put their bins out and the contractor will move them to a point where they can be serviced
  • The contractor will endevour to minimise disruption and will assist residents with any reasonable request.

  • Council apologises for any inconvenience.