54 Prestons Road - Redwood Pump Station upgrade

What

Drilling new deep wells and installing secure above ground well heads to ensure long-term drinking water security for the community.

Why

Upgrade our city’s water supply network to ensure safe and secure drinking water.

Where

54 Prestons Road, Redwood Pump Station, Redwood.

When

23 June 2021 to late June 2022. Monday to Saturday, 7am to 6pm (weather/site condition dependent).

Contact

The contractor is City Care Ltd. Phone Mike Rhodes 027 702 9525, Monday to Saturday, 7am to 6pm.

Details

  • We need to mobilise some large machinery to the site so we’ll be removing one of the trees at the front of the pump station.  
  • Construction equipment moving into and out of the work site, and drilling operations will create noise that we aim to minimise as much as possible.

Impacts to traffic and residents

  • There will be a shoulder closure and no parking outside 54 Prestons Road.
  • Access to properties will be maintained at all times.
  • No work will be done on Sundays or public holidays.
  • Drinking water will not be affected at all.

Thank you for your patience while we upgrade the pump station.