What

We are drilling two water bores to take water and reinject water in the ground.

Why

This work will upgrade the water supply to the Pioneer Recreation & Sport Centre heating system.

Where

Pioneer Recreation & Sport Centre, Somerfield.

When

Mid-April 2023 until late September 2023. Monday to Saturday, 7am to 6pm (weather/site condition dependent).

Contact

The contractor is McMillan Drilling. Phone 03 324 2571, Monday to Friday, 7am to 5pm. Please advise if you have specific property access requirements e.g. medical visits, home help, large vehicle deliveries, planned works.

Details

  • We are upgrading the water supply for the swimming pool’s heating system.  This requires two new water bores so we can extract and re-inject groundwater.  The bores will be in the grassed areas alongside Lyttelton Street and will be fenced during construction.
  • There may be brief disruptions to traffic on Lyttelton Street as large equipment is loaded onto the site.  Car parking at the Centre will not be affected.
  • Following the bore drilling work, we will install pipework to connect the water bores to the pool plantroom.