Retaining Wall renewals - Lyttelton

What

Renewals/ repairs to retaining walls

Why

Poor condition of retaining wall is affecting footpath

Where

41 Winchester Street

When

From 19 November 2018 to 24 December 2018

Contact

The contractor is Hunter Civil, phone Andreu Catala 028 850 00842 between 8 am- 5 pm Monday to Friday. Advise us if you have specific property access requirements e.g. medical visits, home help, large vehicle deliveries, planned works.

  • The repair adjacent to 41 winchester street involve excavating the footpath, augering and then installing a retaining wall of cast in-situ concrete piles.
  • During the works traffic will continue to use Winchester street, with both lanes being moved north within the road reserve.
  • Pedestrian access will be provided.

Takiuru ki ā mātou ratonga
Log in to our services